	<title>Quality Assurance &#187; phase end</title>
	<atom:link href="http://www.qasigma.com/tag/phase-end/feed" rel="self" type="application/rss+xml" />
	<link>http://www.qasigma.com</link>
	<description>QA Portal &#124; QA Guide &#124; QA Site</description>
	<lastBuildDate>Thu, 05 Nov 2009 10:13:11 +0000</lastBuildDate>
	<generator>http://wordpress.org/?v=2.9.1</generator>
	<language>en</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
			<item>
		<title>Phase End Audit Checklist</title>
		<link>http://www.qasigma.com/2009/04/phase-end-audit-checklist.html</link>
		<comments>http://www.qasigma.com/2009/04/phase-end-audit-checklist.html#comments</comments>
		<pubDate>Wed, 22 Apr 2009 13:44:00 +0000</pubDate>
		<dc:creator>admin</dc:creator>
				<category><![CDATA[Basics]]></category>
		<category><![CDATA[audit checklist]]></category>
		<category><![CDATA[phase end]]></category>

		<guid isPermaLink="false">http://qasigma.com/2009/04/phase-end-audit-checklist/</guid>
		<description><![CDATA[


Phase End Audit: Done at every phase end such as Requirement Analysis, Design, Code and Test phases for development projects.
Checklist for Phase End Audit:
1. Are the NCRs of the previous Audits closed?
2. Have requirements been elicited, prioritized and validated?
3. Have the Client approved to the FSD / Design / relevant phase work products?
4. Is size [...]]]></description>
			<content:encoded><![CDATA[<div id="in_post_ad_left_1" style="float:left;margin: 5px;padding: 0px;"><script type="text/javascript"><!--
google_ad_client = "pub-0090152418549394";
/* 160x600, created 6/26/08 */
google_ad_slot = "1826740342";
google_ad_width = 160;
google_ad_height = 600;
//-->
</script>
<script type="text/javascript"
src="http://pagead2.googlesyndication.com/pagead/show_ads.js">
</script></div><p><strong>Phase End Audit: </strong>Done at every phase end such as Requirement Analysis, Design, Code and Test phases for development projects.</p>
<p>Checklist for <strong>Phase End Audit</strong>:</p>
<p>1. Are the NCRs of the previous Audits closed?</p>
<p>2. Have requirements been elicited, prioritized and validated?</p>
<p>3. Have the Client approved to the FSD / Design / relevant phase work products?</p>
<p>4. Is size and efforts were estimated after the FSD was approved?</p>
<p><span id="more-54"></span></p>
<p>5. Is the effort distribution mentioned in Project Metrics same as that mentioned in MS project Schedule?</p>
<p>6. Have the reviews been performed on the work products?</p>
<p>7. Was causal analysis performed for the phase, have suitable action items been identified?</p>
<p>8. Is a DP checklist prepared, as planned? Was it used in the phase? Has it been enhanced as needed?</p>
<p>9. Is the Functional Configuration Audit / Physical Configuration Audit conducted ?</p>
<p>10. Have all defects been closed?</p>
<p>11. Have the Traceability matrix updated?</p>
<p>12. Are all the planned metrics collected?</p>
<p>13. Are the sub-process such as preparation, review and rework monitored and controlled during the progress of this phase and corrective action if any, recorded in metrics sheets?</p>
<p>14. Are the inferences on the overall process performance based on the sub-process performance documented in metrics sheets?</p>
<p>15. Are the data available in the metrics sheet verified against the source?</p>
<p>16. Is the corrective and preventive action taken quantitatively within the phase?</p>
<p>17. Is correlation for variance data, predictions inferences appropriate for the process and sub-process variances observed in metrics sheets?</p>
<p>18. Have Decision Analysis &amp; Resolution been applied in project as identified in the Project plan?</p>
<p>19. Is consistency maintained for the inference data and actual variance observed in metrics sheets?</p>
<p>20. Are changes to the schedule tracked &amp; updated?</p>
<p>21. Are the changes in the schedule affects the project’s delivery date? If so, have the Client been informed the same?</p>
<p>22. Are support groups informed about schedule changes affecting them?</p>
<p>23. Are the support group commitments revised accordingly?</p>
<p>24. Is the Risk Mitigation Plan reviewed periodically?</p>
<p>25. Has the status of risk plan been updated?</p>
<p>26. Are all the work products been audited before delivery?</p>
<p>27. Have the Change Control Form generated for each change requested?</p>
<p>28. In case of major changes, has the approval for the same be obtained from respective authority before initiating work on the same?</p>
<p>29. Have the complaints from the client are recorded?</p>
<p>30. Are Client complaints tracked and closed?</p>
<p>31. Are all the team members recorded their efforts till date?</p>
<p>32. Are the Periodic reviews conducted in the planned frequency?</p>
<p>33. Have the effort on review &amp; rework noted down?</p>
<p>34. Have the process database been updated with all the completed documents?</p>
<p>35. Is Master List of Project Documents updated?</p>
<p>36. Is the Access Control Library updated for changes?</p>
<p>37. Does the Requirement Tracebility Matrix contain the physical file name for source code mappings?</p>
<p>38. Is the total Number of requirements identified in Requirement Tracebility Matrix in sync with Functional Spcification Document?</p>
<p>39. Does Requirement Tracebility Matrix consist of bi-directional traceability mapping?</p>
<p>40. Is the build verification done before Testing?</p>
<p><strong>Also See:</strong></p>
<p><a href="http://www.qasigma.com/2008/11/work-product-fsd-audit-checklist.html">Work Product &#8211; FSD Audit Checklist</a></p>
<div id="in_post_ad_bottom_1" style="clear:both;margin: 5px;padding: 0px;">Sponsored Links: <br/>
<script type="text/javascript"><!--
google_ad_client = "pub-0090152418549394";
/* 336x280, created 12/12/08 */
google_ad_slot = "9487988611";
google_ad_width = 336;
google_ad_height = 280;
//-->
</script>
<script type="text/javascript"
src="http://pagead2.googlesyndication.com/pagead/show_ads.js">
</script></div><div style='clear:both'></div>]]></content:encoded>